VIABLE BUILDING – LEADER PROJECT
VILLAGE HALL, PAVILION, BEACH, PIER, ETC.
- Painting the roof of the village hall (done in 2016)
- Beach renovation (done in 2016)
- Boat/ship dock (built 2016)
- Pavilion (made in 2017)
- Window renovation and painting (done in 2018)
- Disabled ramp to the entrance (made in 2018)
- Landscaping of outdoor areas (done in 2018)
Project completed
BEACH / BOAT PIER
- A new pier will be built on the site of the old pier.
- Depth at the end of the pier approximately 1,5 m, further along 1 m
- Spaces for eight motorboats on the sides of the pier
- The boat launch is being renovated.
- The beach is being dredged for about 100 meters.
- The current changing rooms will be renovated.
- A terrace will be built in front of the changing rooms.
- If necessary, a new swimming pier will be built.
- A fabric is installed under the beach sand
- Fine sand starting from the terrace
- Sausage place
Construction schedule:
Let's start at the beginning of April 2016.
Completion rate 2016 85%, to be completed in spring 2017
PAVILION
- To be built between the village hall and the sauna building
- The building replaces temporary structures
Construction schedule:
Starting in April 2016
Built as volunteer work
YARD PLAN
On the right is the bottom view.
Please give me advice on what to do and what kind of plantings to do.
VILLAGE HALL KITCHEN RENOVATION THEME PROJECT
- Implemented in 2018
- Purchased dishwasher (washing time 3 min.)
- Purchased multifunction oven
- Purchased hot water heater