Marking the construction site on the terrain

The purpose of marking the location of a building is to guide the builder
to build in the location specified in the building permit.

The marking of the building site must be ordered before the actual construction work begins. The time for the marking measurement should be chosen so that the construction area has been cleared, the topsoil has been stripped and any gravel has been spread. However, do not start earthmoving work on the construction site if the boundaries are unclear.